Swan Creek Pipeline Bridge & Fish Remediation Project
The City of Tacoma hired NGA to assist in the design and monitoring of a pedestrian bridge above the pipeline, while the culvert beneath was removed to restore the natural stream and improve the fish passage.
A crane housing D46-32 diesel hammer was used to drive 30 inch piles around the pipeline to facilitate construction of the bridge.
Location: Tacoma, WA